1) What is the difference between Change Management Plan and the Configuration Mangement Plan since the two plans almost look the same.
2) Also, if we have change control procedures in the Change Management Plan (which I guess we have only 1 Change management plan for the entire project) then why do we need sections to manage changes in the Cost, Scope and Schedule Management and other plans?
3) Finally, change management plan and configuration management plan are part of the Project Management Plan while I think change control system and Configuration management system is a part of the Enterprise Environmental factor. So if we have these systems then why do we need these plans ? Are these plans a part of the respective systems and if yes then shouldnt the 2 systems also be a part of the project management plan? I guess I am getting really confused in seeing the real significance and the difference between each of these systems andf the plans.


pmpodcast
Sun, 09/19/2010 - 18:25
Permalink
Change Management Plan vs. Configuration Management Plan
Hi,
Although I have replied to the same question at some other forum, I would like to repeat the answer so that others may benefit from it as well.
pmalik
Wed, 06/29/2016 - 18:29
Permalink
configuration management vs change management
Hi,
I wrote an article on configuration management vs change management. I think you will find it interesting. It provides 3 points of differences but it also talks about how these topics are complementary to each other - http://www.pmbypm.com/difference-between-configuration-management-vs-change-management/
Hope it helps.
Mery Nolla
Thu, 09/01/2016 - 15:58
Permalink
So you're most likely right