These two phrases worth 40 ITTOs. (This worked for me and many)

Dear Future PMPS –

 

Here is the Link to the Dump sheet. (Thank you admin for allowing me to share this document).

 

 

http://pmzilla.com/files/Dump_Sheet_For_PMzilla%20Raj%20Pavani.doc

 

 


NOTE: This approach is very much useful for those who are already planning to remember Page 43 of PMBOK. If you are NOT planning to remember Page 43 of PMBOK, please do not waste your time to understand my approach. Let me get to my approach without much waste of time.

As part of my PMP preparation, I realized that, one of challenging areas for me was to remember the common ITTOs. I didn’t have problem remembering distinct ITTOs which are very unique to its process.
Did you realize that following are very common ITTO?
 
C- Change Requests ,D-Project Documents Updates (Output),E –EEF (Input),O – OPA (Input) ,P – Project management plan updates , Ue – EEF Updates , Uo – OPA Updates ,X – Expert judgment 
 
Can you remember CDOPUo?
Ok, now take a look page 43 and write down ‘CDOPUO’ in Control Scope, Control Cost, Control Schedule, Quality Control. You will be surprised to know that, for all these process groups, CDOPUo   represents common inputs, tools and outputs.  .
Just remembering one phrase of CDOPUo, you mastered the common ITTos for 4 Knowledge areas.
How about CDEPOX?.
You place CDEPOX in Direct and Execution, Monitor and Control and Integrated Change Control. (As an exception, change request is Input for Integrated Change Control instead of Output).
Do you feel good now?. Just remembering two phrases, you remember as many as 40 ITTOS.
If you like this approach take a look at attached dump sheet in PM Prep cast website.
Good Luck and Best wishes.
Regards,
Raj,PMP
 
 

I quote below what you wrote:

"How about CDEPOX?.

You place CDEPOX in Direct and Execution, Monitor and Control and Integrated Change Control. (As an exception, change request is Input for Monitor and Controlling instead of Output)."

p: 61 and p: 73 of PMBOK 4th Edition do not confirm that 
... change request is Input for Monitor and Controlling instead of Output).

any thoughts?

or its that I am wrong...! 

Hi PMPBoy - You caught me. That should have been 'Perform Integrated Change Control' instead of 'Monitor and Controlling'. Thanks!!. Please let me know if you think this is useful technique. I changed the original posting to refelct this change. Regards,Raj.

Hi

Can you send me the dump sheet that you mentioned on this blog.. It'd really help me to memorize these ITTO's. If u don't mind, can you send it to anandkalyan@gmail.com pls.

Hi Raj,

I was very much concern about the memorizing ITTOs for my PMP and for quite sometime I am silent member of this group. no doubt the ADMIN and other active members are helping PMP Aspirants.

Would you please send me the braindump on mqayyum72@gmail.com.

Thank you RAJ and PMZilla for great help.

Regards,

Qayyum 

I am glad that my approach for remebering ITTOs is helping you. Everybody has their own way of memorizing things, if this approach match your style of memorizing things, I am sure you can memorize all ITTOs in matter of a week. I do not know how to attach the 'dump sheet' here, so I sent an email to you directly. If you know how to attach the sheet, please add the 'dump sheet' here in this website.


Good Luck.


Raj Pavani, PMP.

I also found this approach of memoriing ITTOs very helpful.


Pls send me the braindump sheet if you can to anand2381@gmail.com

Anand - I sent you the dumpsheet and the PMP Notes that I used for my preparation. These two are for your refference and can be used with any other material that you are already using. Good Luck!!











































































 Knowledge areas


Initiating Phase


Planning Phase


Execution


Monitor and control


Closing phase


Integration management


6


Project charter


     EOX


 


 


3.Develop project management plan


         EOX


23.Direct and Execution


CDEPOX


 


‘pmis’


31. Monitor and control  CDEPOX


32. Perform Integrated control


CDEPOX


41. Close project or phase


OUoX


Scope


5


 


4.Collect   ----Requirements


5.Define scope DOX  apef


6. WBS  DO Decompose


 


 


33. Verify scope CD inspection


34. Control scope CDOPUo variance analysis


 


 


Time


6


 


7.Define activities EOX red-t


8.Sequence activities DO pads


9.Estimate activity resources DEOX


bppae


10Estimate activity durations DEOX


rtpae


11.Develop schedule DEO


Sc-sc-wars


 


35. Control schedule


CDOPUo


 


Vp-sp-wars


 


 


Cost


3


 


12.Estimate cost DEOX


bp-vc-rtpae


13.Develop budget DOX


frech


 


36. Control cost


CDOPUo


 


Eft-vp-p


 


Quality


3


 


14.Plan quality DEO


Bench, coq, cost/b/a, doe, Fcharts, methodologies, stats sample, additional tools.


24.Quality assurance


CDPUo


 


 


37. Quality control


CDOPUo


 


 


 


Human resources


4


 


15.Develop human resources plan EO


 


ono


25.Acquire team EOP avpn


26. Develop team Ue itc-grt


27. Manage team COP UeUo cop-ii


---------


-


Communications


5


Identify stake holders


    EOX


16. Plan communications DEO


 


Four c ( Reqs, tech. Models, methods)


28. Distribute information


Ouo ci


29. Manage stake holders


CDOPUo  cim


38. Report performance


COUo f-vcr


 


Risk


6


 


17. Plan Risk management EO meet and analysis


18.Identify Risks EOX cdesaid


19. Qualitative risk analysis OX 4epr


20. Quantitative risk analysis OX edq


21.Risk response DPX ssce


 


39. Monitor and control risks


CDPUo  3r-vts


 


Procurements


4


 


22.Plan procurements CEOX mec


30. Conduct procurement


CDOPX  bp-pae-ii


40. Administer procurements


CPUo  3p2cir


42. Close procurements Uo


 


C- Change Requests ,D-Project Documents Updates (Output),E –EEF (Input),O – OPA (Input) ,P – Project management plan updates , Ue – EEF Updates , Uo – OPA Updates ,X – Expert judgment


 



 


Hi Rajapavani,

Can you send me the dumpsheet on sunilnegig@gmail.com

I would appreciate if you can do that since ITTOs are a big challenge here !

Thanks in advance !

 

Hi Rajapavani,

This is useful Can you send me the dumpsheet on tuckhuay@gmail.com ?

waht does 3r-vts . cop-ii and other abreviation sstands for?


 

Hi Raj,

Can you send the dumpsheet to mdkk@rediffmail.com

 Hi.  This is very helpful.


Can you please send this to sanbackup12@gmail.com?


Thank you.


san

This approach is awsome, could you please send in the sheet at sachinsinha3@gmail.com, and other prep material.

Thanks in advance

cheers

Sachin

This approach is awsome, could you please send in the sheet at sachinsinha3@gmail.com, and other prep material.

Thanks in advance

cheers

Sachin

Hi raj, could you please send me dumpsheet and other material you have for pmp to vivekjai0122@gmail.com.


Thanks in advance.

 Hi.  This is very helpful.

Can you please send this to tobi_is_a_good_boy_11@yahoo.com?

Thank you.

Tobi

 

Dear Raj,

I am so thankful at your for helping us memorising the ITTO for PMP exam. It really helps a lot.

Anyway, can you please let me know what is the meaning of the terms included in the dump sheet like "bp-vc-rtpae" , etc. etc.

Also can you please send the dump sheet in kctipathy@gmail.com ?

Thanks a lot in advance

Regards,

Kishor Tripathy

googler's picture

"Anyway, can you please let me know what is the meaning of the terms included in the dump sheet like "bp-vc-rtpae" , etc. etc."


For other mNemonics - consider going through the below link -


Memorizing Inputs Tools and Outputs - updated for PMBoK 4th Editon


http://pmzilla.com/memorizing-inputs-tools-and-outputs-pmp


hope this helps....

Could you please send me the ITTOs dump sheet you prepared for giving the exam on my mail id:dipendratiwari@gmail.com.It is an excellent way of remembering them.Hats off to you for coming with such a good idea.

please send me the dump sheet to nbhavani01@gmail.com

 Hi

Can you send me the dump sheet that you mentioned on this blog.. It'd really help me to memorize these ITTO's. If u don't mind, can you send it to manoj625@hotmail.com pls.

Raj,

I have just started studying pg. 43 and would really like to get a copy of your dump sheet.  Please email it to fdmurray03@verizon.net

Thank you in advance! 

Hello,

You have done a great job and this looks very helpful to remember the ITTO's .

Could you please send a copy of your dump sheet and legend description of letters/phrases to the following email , execs4u@gmail.com. Thank you

Hi

I just saw the blog. it looks interesting

could you plz send me the dump sheet and legend at sadiaziawan@gmail.com

thanks

Jayshil Mehta's picture

Hi  Raj,


     Can u pls send me that dump sheet on jtmehta@gnfc.in  as ITTOs are the most imp thing to remember and it seems u have a good technique.


Thanks


 

Hi,


 


Could you please send me the Dump Sheet and any other reference material you have to prepare for PMP. Please send it to smshameem@gmail.com


 


Regards,


Syed

camgiannetti's picture

Hi Raj,


Thanks for making the effort to do this.  Woudl you kindly send me the dump sheet you referred to?  My test is on Friday and I could use all the help I can get.


Thanks,


Cam


cngiannetti@gmail.com

Can you please email the dump sheet: to cacaip@hotmail.com

 

Thanks.

 Dear Raj, 

Please fwd me a copy of dump sheet to Robin25may@yahoo.com.sg

 

Thank you for posting.  This is very helpful.  Can you email me your dump sheet at aimpio@yahoo.com.  Thank you. 

Arunava Das's picture

Hi Raj,

Did you update the dumpsheet as per PMBOK 5th edition , if yes then request you to upload the same or else send me in my mail id i.e scorpio.ad@gmail.com

 

Thanks in advance !!

hi,

Is dumpsheet as per PMBOK 5th edition avialble ?

Thanks and Regards