Question on Scope

From Head First,

 

Question 105

Which is best description of project scope ?

A ) All of the features and deliverables your project will deliver

B ) All of the products your project will make

C ) All of the people involved in your project

D ) All of the work you will do to build the product

 

I want to know what do you guys think is the answer and why

 

thanks

the correct answer is option A as scope includes all the work and only work that project will deliver.

Option B - product scope

Answer should be D - all work needed to build the product.

@ pmpstudent121 : Option D is product requirements not project scope.

Answer from Head first is ( which i think they are wrong )

Answer: D
Product scope means the features and functions of the product or service being built. Project
scope means the work that’s needed to build the product.

I think pmstudent121 is right, answer D should be wrong, it look like requirement

SumathiCH's picture

All work to produce features or products or components agreed to be delivered is project scope.